Speed-to-power schedule risk
Cost- and resource-load the programme to the power-on date. The analyst flags activities trending late before they push speed-to-power for a whole hall.
Bildstak for data centers & mission-critical
Hyperscale and colocation. Bildstak federates your models, P6 programme, long-lead procurement, cost data, and commissioning — and an AI analyst tells you what's putting the power-on date at risk.
Capabilities
From long-lead procurement to MEP coordination, commissioning, and delivery risk — in one connected workspace.
Cost- and resource-load the programme to the power-on date. The analyst flags activities trending late before they push speed-to-power for a whole hall.
Track generators, switchgear, chillers, and transformers against order-by dates back-calculated from the programme. See which long-lead items threaten the date.
Federate architectural, structural, and MEP models. Find clashes across disciplines before they hit a congested mechanical/electrical room on site.
Track Cx levels and COBie handover deliverables against the asset and equipment list — what is verified, what is outstanding, what is missing before go-live.
Cost-loaded schedule and EVM across base build, fit-out, and MEP. Change orders roll into earned value and cost variance as actuals flow in.
An autonomous analyst investigates the whole build — schedule, procurement, coordination, commissioning, and documents — and ranks the risks with the evidence behind each.
Supported sources
Primavera P6, IFC / BIM models, Procore, Aconex, SAP, Maconomy, Excel, CSV, and PDF document libraries. Thirty-plus source types, federated into one model. No middleware required.
Bring your programme, models, and procurement log. We'll run the demo on your real project data.